CACT (China)
CACT Huizhou 19-3/2/1 DPDSV Pipeline & Cable Works
June 2004 - September 2004
Hallin Marine engineered and installed 2 x Combined Fibre Optic and Power Cables (24.4Km and 7.3Km), 1 x Flexible Riser, 4 Spool Piece Tie-Ins and numerous other subsea construction work scopes from DSDSV Fu Lai with single mobilization offshore Shekou, China. At the same time Saturation Diving services were provided onboard construction/pipeline barges HD2500 and HD423.