Xijiang (China)
Installation of FPSO Riser System conoco Philips Xijiang Field
July 2004 - October 2004
Hallin Marine was contracted by Bluewater Energy to carry out the Installation engineering and offshore execution of modifications to the BTM and associated riser system in Xijiang Field China to enable FPSO Munin to produce at the location on DP. Hallin Marine used the DPDSV Fu Lai with Saturation diving, ROV and Project equipment installed onboard.