Hallin Marine was awarded a contract for ROV pipelay support services onboard the lay barge Saipem Crawler by OMM.
Hallin’s Quasar 3 system was installed onboard the lay barge to complete pipeline lay support and as-laid survey opertions, diving to depths of apprximately 60 metres. A long tether excursion of 400 metres was required.
